Thursday, May 30, 2013

You Thought You Knew Chaos - and Volume

But until you've had a tree guy taking down a huge white oak (chainsaws) while an electrician runs all through
your house turning off power (drilling holes) while a chimney guy starts cleaning out your fireplace (shop vac) - ALL while your 4-part family is home for the summer, you really can just think you know chaos. And this is all while you're trying to find subcontractors and deal with getting a building permit.

Good times.

Monday, May 6, 2013

Variance fun & Permitting OR How to lose your mind and learn to like living alone on an island

Applied for City variance and paid required fee. They said, "Go to LCNA and NPU meetings in April, then come see us in May" and I was put on the BZA docket. Emailed my NPU rep as City told me and he said, "Just go to LCNA meeting and then we'll touch base." Gave LCNA additional documents they required and went to meeting - APPROVED. First hurdle overcome.

Spent too much time uncovering subcontractors and trying to make decisions. Meanwhile, my NPU meeting passed without me. Never heard from them, though neighborhood passed along their approval. Few days later found a text message from NPU rep asking if I was coming to the meeting (I rarely text and don't get alerts). Emailed him and he asked if I was still going to BZA meeting as scheduled or did I want to defer until next month's NPU meeting? I said I was going to BZA. Since BZA really makes decision and my neighborhood approved, why shouldn't I?

Because they would deny me! Thought this was a no-brainer but realized I was without the brain. Since NPU "deferred" my case, BZA refused to pass judgement. Told them my neighborhood approved unanimously but they still refused my variance. I was stunned. Was I now going to have to wait a full month, or more, before starting this reno? This would not be good for creating calm before Wendy went back to teaching at the beginning of August.

Stumbled out of the meeting dazed and confused. As I stood outside the doors, someone asked me, "Do you need help?" I asked if she understood variances and started to share my tale. She turned out to be with the Mayor's office and immediately got on the phone and connected with someone in building permits. I met with Ann Heard and she talked about "the Agee rule" and what my options were. Really, there was only one option - AT RISK PERMIT. Did not sound fun.

Saturday, May 4, 2013

Plunging Head First

So deciding to be the GC means that I'm responsible for all the subcontractors AND the joy of permitting.
For us, the first step was a variance.

Since we're City of Atlanta, we need to have a variance. Usually a variance is if you're expanding the footprint of your house, building a huge SnoCone on top of your house, or somehow changing the birds-eye view of your home. Not so in the City of Atlanta. "Grandfathering in" isn't really accepted. Now our plans are to go straight up vertically and not have a neon Santa rotating above height restrictions. Still we need a variance. Here's why...

So our home was built in the late 1930s early 40s by my stepfather Russell Dale's parents. We've got an old picture from 1941 that shows a sapling where a mammoth oak now stands. Back then the setbacks weren't quite the same as today. Meaning that it was ok to be just 5 feet from your neighbor's property line and not a big deal if you were only 32 feet from the street. Today, those distances are 7 & 35 respectively.

So we had 2 choices, we make our granite-based home 2 feet narrower and move it back 3 feet or get a variance. So the process began. It's a 3-step process.

First, you find out when the City of Atlanta's BZA (Board of Zoning Adjustment) meetings are. Sometimes

they're only once a month and their deadline is way in advance. I just made the March 20th application deadline for the MAY 9 meeting! Next meeting wouldn't be until June 6. They ask for all kinds of documents and fortunately I had them because we had our architect early. Plan accordingly.

Second, you go to your neighborhood association's regularly monthly meeting PRIOR to the BZA's meeting. My Lake Claire Neighborhood Association met at end of April. Now I had to notify them I was applying for a variance. They wanted additional drawing, maps, and signatures from all neighbors within 100 feet or so. That meant I ended up getting 15 neighbors "ok" to do my renovation that would not impede their sightlines, sunshine, or quality of life. Fortunately, I have terrific neighbors so this part went smoothly (remember I only asked for change in setback from 7 to 5 and 35 to 32 feet).

Third, you go to your Neighborhood Planning Unit (NPU) monthly meeting. City is divided up into NPUs and each one is kind of an oversight for multiple neighborhoods. They can dislike something your neighborhood liked and vice-versa. Usually they work together.

With the thumbs up from Neighborhood and NPU, you go to BZA (see how you have to get the scheduling right?), and they make the final determination. First two can deny your variance but the BZA is the only one that has the true authority in this triumvirate. They can say Yea or Nay. How hard can this be?

Monday, April 1, 2013

3rd - Decide if you've got the stomach lining for it

Do you hand off the project and pray or do you take it on as the GC (General Contractor)?


For us, I really wanted to "have a hand" in the project. Trying to find a GC who would let me do parts of the job looked very unlikely so I finally talked Wendy into letting me be the GC. That meant I'd find and hire all the subcontractors who would do the work. This would save us money from typical GC markups and allow me to feel like I was more in control of schedules and fate.

Everyone says you should get AT LEAST 3 recs for every contractor (that includes architects as well as builders/GCs). I did that and learned there's a lot of wiggle room. I had architect quotes that varied by $3K and builders who said it'd cost around $120K+. One plumbing estimate was $4K higher than another. We are only adding 1 bathroom and a washing machine drain!

Getting multiple quotes, asking for referrals from friends/family, and just calling up folks helped put perspective on the costs. What it didn't do was give me the TRUE picture of how things would work once we got started. Signing a contract with a sub is easy. Slotting them into the project when you need them to show up is not easy.

I now see why folks say it's a painful process... and it may be an ulcer-inducing puzzle. But I think I'm going to enjoy the pain and results.

Thursday, March 21, 2013

2nd - Find a Pot o' Gold

Financing can be a tricky endeavor. Get your application in earlier rather than later.

We tried to get ours LAST June and almost had things lined up when they realized we'd not owned the house for a year (some banks/credit unions have a rule about this). So they told us to just wait. As you know, that's not really my strong suit.

So after much cursing, gnashing of teeth, and cooling down, I researched other options. USAA handles our insurance and they were more than happy to let us borrow money (Home Equity Line of Credit). Now we could have gotten a Home Loan or Mortgage or whatever but the HELOC seemed like the best fit for us since we weren't exactly sure how much money we needed and wanted some flexibility. Thanks USAA!

Now it can take 6 weeks or more to nail down financing, so plan accordingly. By end of March we had our money. Once the money was available, it was time to nail down contractors.

Friday, March 15, 2013

1st Renovation Tip - Start with a Plan

Helps to know what you want it to look like and how much it'll cost. Sometimes the whole cost thing determines how you want it to look.


So I'd highly recommend finding an architect to help with this process. They'll be able to give rough drawings that you can take to contractors for bids. Allyson McCarthy is a neighbor and worked with us to figure out what we could build at a reasonable cost. This began in October I believe. We finished our drawings in May.  I'm sure we took longer than most but Allyson was patient. Give yourself lots of time to think this part through well.

Then you can go to bank and say, "I want $1 million to add a bathroom." All negotiations begin this way.

Monday, August 6, 2012

Day 1 of Elem/Mid School 2012

Chaos reigned but we survived. Keely was seamless. Deacon had HUGE issues.
Though Deacon's bus never showed up for the first day of middle school, he had the benefit of knowing that "Growlers are here!"

The bus did take him home and I picked up Keely. What will Day 2 hold in store? Will the middle school bus show up? Will Keely decide to become Assistant Principal? Only time will tell.