Thursday, June 13, 2013

Roofing done and screened porch begun


Wednesday was to be last day I thought. They finished the shingling, my structural engineer (Bryce Hattori)

signed off on their framing, and they began the screened in porch. Adding a skylight to the screened in porch took a bit longer with the framing.

At this time I was notified that I'd ordered the wrong windows. Custom windows ordered wrong are not a good thing. Basically, I had the rough opening sizes and ordered windows that should fit. Problem was the windows needed to be ordered as "twins" - meaning 2 windows together. Miscommunication with the window folks meant I didn't get front and master rooms right. Supposedly, we'll make them work but not until siding gets done next week.

Wednesday, June 12, 2013

Shingle, shingle, who's got the shingles?

We went back and forth on shingles. Wendy long ago picked out a pretty architectural shingle (more
expensive with longer warranty). I'd agreed to it but then we had some interesting discussions about spray foam insulation with Tony and Dieter. Seems conventional wisdom says a roof needs to breathe to keep it cool. This is done with either roof vents or a ridge vent at the top of your house and then soffit vents under the eaves which allow fresh air to move through the roofline.

With spray foam, they basically seal up your whole roof. Between the rafters there are no spaces for air to
flow. It's a closed system that doesn't need soffit vents under the eaves. Supposed to be a true encapsulation but some roofing folks were saying this would "bake" the shingles because they never got any relief from the intense heat. They said shingle manufacturers would not stand by their warranty for the shingles if applied.

A few phone calls/emails to Spray Foam Alliance and CertainTeed painted a different picture. Turns out spray foam is still pretty new and not everyone has all the latest info. In the end, shingle manufacturers say temp only raises maybe 1 degree with spray foam underneath, so not much of a difference. Docs get shared saying all manufacturers support spray foam.

But now I realize that with our big gable front and shed roof in the back, there's hardly any roofing that you'll see. So why are we spending more on shingles? Wendy didn't like the change but could see how we could use the extra $750 elsewhere and her second choice was a very attractive shingle.

Tuesday, June 11, 2013

Raise the roof time



Good weather was forecasted for the week so Tuesday the roof was the goal. Actually, they worked on getting roof decking down while others framed up walls inside. It went pretty fast. Interesting to see how quickly framing was marked on the decking. When they said plumbing and electrical were "off", I panicked for just a moment. Then Pedro showed me how we could just move walls slightly and it'd all work.

By end of the day, roof decking and felt paper were down - good for waterproofing. Though we had huge holes where windows were to go, Few walls were up but no screened in porch yet. Wednesday looked to be the last big push.

Other than feeding the crew lunch each day and providing some end of day libations, I was mainly answering questions and calling contractors to notify them of the ever-changing calendar. Somehow it was invigorating and exhausting at the same time. Each night I'd finish around 730 or 8 cleaning up or planning for the next day. Many nights I was emailing even later to keep things moving. Not sure how folks would do this if they just went to work and hoped for the best.

Monday, June 10, 2013

Time to deck

8am was the usual arrival time of most of the crew. Around 830 or so they'd get cracking. Think there are City rules on how early you can begin. Since some were coming from as far away as Cartersville, I wouldn't
expect much before 9.

Rough plumbing inspector showed up early, since he missed Friday's appointment, and was gone in about 5 minutes. Talking to him I learned even more about how inspectors see their job and one's opinion and ok might be countered by another's view and denial. We got the thumbs up and that was the key to me.

Talked to Pedro about why floor joists weren't done Saturday and he said the wood was all on the bottom of the giant pile. He knew they had to get tarps up, so focused on getting the main ridge and front ridge up with a few rafters. Spilt milk. Told him they'd need to get rest of joists done first thing but he already had that planned. Lou showed up around 1030 to get wiring done and it was chaos under the Blue Dome.

Framers were already laying down decking on half that had wiring done. They were moving fast. Things
came together and by lunchtime joists were done and deck was down. The intense pounding from framers removing the support blocking between existing joists was about as loud as anyone could live through. Fortunately, none of the ceiling came down but many little plaster spots fell from the ceiling below. Looks like I'll be busy patching with mud.

By end of the day, rafters were up and exterior walls were almost done.

Sunday, June 9, 2013

Let's pull some wires!

I told Lou I'd help him pull wires since he was coming out on a Sunday. That way we'd make sure it'd be ready for Monday morning.

Saturday night we got some rain - some heavy. Fortunately, they tarped the house very well. There were 2 spots where water pooled in the tarp but I could take a large broom and "push" the water off the "roof" pretty easily. Just two episodes lasting about 10 minutes each and we were good for the night.



Sunday brought beautiful weather and Lou showed and was impressed with the new space and increased height (about 4 feet) of the new ridge. Have to admit I was too. Never can get a true sense of space from a one-dimensional drawing. Then he asked the question, "Where are the 2x10s?" I'd been so enamored by the new blue ceiling I neglected to notice that the framers had only installed HALF of the 2x10 floor joists!

Couple of calls later to notify Tony of the misstep left us with no real option. For some reason framers didn't make floor joists the main goal. They'd have to do the other half first thing Monday. Lou agreed to pull half the house and then get there and work around framers Monday.

Even though I'd thought and planned and communicated with everyone, the plan went awry. Such is the life of a GC.

Saturday, June 8, 2013

Saturday IT IS

Crew showed up ready to rip. They hit the house hard taking off the shingles, then breaking down the whole


roof. They stacked the old wood in three spots around the house. Turns out Pedro wants to use the wood to build horse stalls on his property in Cartersville.


So the plan is to focus on getting those floor joists in today. That way Lou can come tomorrow/Sunday and run all his electrical while crew is off. They can come in Monday morning and put down decking and throw up the walls and roof in a hurry.

They raised the new ridge and covered the whole house in blue tarps - they had me go get a 2nd. An extra $150 is worth keeping rain out of our house. Those guys worked from 9am to 9pm. Can't fault them for their work effort that's for sure.

Friday, June 7, 2013

TGIF

Nope. No crew today. They're officially coming Saturday to start. Tree work still isn't done either. Storms pulled them away for emergency jobs. I've asked them to leave the wood so I can split it and try to pay for
taking down the tree. That may be folly. We'll see.

Inspector didn't show today. Called and learned they'll put us on the top of the list for Monday. Was really hoping that this would be out of the way so that framers could work as fast as they want - AFTER getting new floor joists done for Lou.

Georgia Power came out and switched over our power so we'd be ready for the crew on Saturday. Lou
wrapped up some electrical stuff and we just set our alarm clocks for early in the morning.