So most of Monday Lou worked amongst the "sticks" to get all of our electrical needs met. It was taking shape. His work was key for HVAC to install on Tuesday.
Tuesday morning 7am Danny (from Comfortair) showed up like he promised. Lots of HVAC stuff to unload in our yard before his crew showed up to get
it all in the attic.
Not to be outdone, Mike and Lorenzo got here to finish out the plumbing vents through the roof and other such fun. They had good weather to vent through the roof and work out the kitchen vent from the back deck. Part way Still Mike was here until almost 9pm making sure everything was right.
Coolest part of the day was the sheetrock delivery. Seeing as how they had 12 and 14 foot sheets of gypsum that wouldn't make it up our stairs, they came while we were without windows and just lifted it up and through the front of the house. Timing was right since Wednesday they planned to come do siding and install all the windows. Still hard work loading in sheetrock but I can only imagine how much easier life is for these guys with a remote-controlled crane helping get the work done. And their timing couldn't have been better. Less than 30 minutes after they were done, the skies opened up and gave everything a good dousing.
Danny's crew got out by dinner time with all of their pieces set. He'd have to come back Wednesday to add a piece to the unit but it worked out well as he was here at the same time as the inspector. He made sure everything met the inspector's checklist.
I called all 3 rough inspections (Electrical, Plumbing, & HVAC) for the same day. All passed and now it's just waiting for the Rough Framing Inspection.